It’s not just the next big thing, it is revolutionary. Its’ beyond big. It’s bigger than big. The next big thing is my next project. It’s really not that big, relatively speaking. It’s only big because I’m actually starting a new big project. There was a time when I would squeeze out big projects like Octo-Mom squeezed out little kids. Not so much anymore.
It’s hard to say what happened. Things got in the way like winter, work and laziness. The thought of a new big project sort of lost its cachet. The old days are old and the new days are less house oriented. I’m pumped about this one though, and soon I will be psyched. No, wait, is it psyched and then pumped, or does pumped come first. I’m not really clear on the whole hierarchy of enthusiasm, but I can feel something stirring. It could be that foot-long green chili beef burrito I had for lunch or it could be the new project. Either way there is definitely something there.
So what is The Next Big Thing? It is the foyer and stairwell. If judged by cost or square footage it is not one of the bigger interior projects I’ve tackled. There are no cabinets to build, nor is there any plumbing, and maybe no electrical. What it lacks in cost and technical challenges though, it more than makes up for in mess, disruption, and verticality.
First the disruption. The foyer is the entry hall. Either I walk around to the backdoor when I enter and leave or I use the foyer. The real issue there is the alarm system. I must go in to the foyer to set or deactivate the alarm. The foyer also sits between the parlor and kitchen, two of the more popular rooms in the house, and it also sits between the front stairs and everything else. I can avoid the front stairs by using the back stairs, but the front stairs are much more convenient and comfortable to climb than the back stairs.
The verticality. The stairwell is tall. It basically ascends the full height of the house, which is roughly 20 feet on the interior. This means scaffolding. I’m going to need to erect scaffolding on the middle landing and that will make it that much more difficult to traverse the stairs. If I need to strip paint off the plaster before I skim-coat, then the scaffolding could be up for weeks, if not months. I also may hang a light fixture, which will only add to the time the scaffolding is up.
The mess. Plaster work and stripping shellac. There is no way around it, these things make a mess, especially the plaster. Putting the plaster on is not too bad, and the mess can be controlled. It is taking the damaged plaster off that makes the real mess. The dust goes every where. I don’t care how careful you are or how much you mask rooms off, there will be, at a minimum, a fine coat of plaster dust on every surface in the house. Fortunately, the 6.5 quake we had a few months back took care of a lot of the damaged foyer plaster for me.
The stairs are another issue. At least they have never been painted, but they need to be taken back to bare wood. They were shellacked back in 1895 and then nothing happened after that. There is also the issue that some of the woodwork has been marred by renters that just had no appreciation for anything, at all, ever! The place was rental units for 80+ years, so it could be worse, but I see a trip to a mill in my future to have a few pieces reproduced. This will no doubt be the largest expense in the project, but even with that, this will be one of the least expensive projects I’ve done on the interior of the house.
I just need to start. That is why I’m trying to get pumped and then psyched, or psyched and then pumped, which ever it is. It needs to be done. After this, the only rooms on the first floor that are left are the front and back parlors. These are essentially one large room, roughly 15X30. These rooms are basic stuff: plaster, paint and floors. Everything else has been done in there (wiring, telecom, stripping, millwork). Once I get this foyer and stairwell done, the rest of the downstairs will be a cake-walk.
I just need to start.