Friday, June 22, 2007

Trimmed Out

I managed to get a few things done during the week. I finished pretty much all of the trim work in the bathroom, which really only amounted to trimming out one window, because everything else was done. It may not sound like much, but it included making a marble window sill (I think it’s called a stool when it’s on the inside), and I had to make the apron (the part under the stool), which entailed some router work. I also made the cove trim, which goes under the stool and in front of the apron.

On top of that, the casing is more of the 1895 casing I’m reusing from the front rooms. The pieces were thick with paint, so that meant more paint stripping. I then had to paint everything after it was installed. I do one coat or primer and 2 top coats. The whole thing was surprisingly involved.

The last thing to do in the way of trim is to make the counter tops for the 2 little built-ins. I was going to go with tile, but now I’m leaning towards marble. I have enough to do the little built-in but not the big one. Judging on what I’ve paid for marble in the past, I'm thinking it’s about $100 for the one counter. I don’t need to decide right now.

The paint on all of the trim is the SW Queen Anne’s Lace. It’s a very pale green and it’s a bit of a chameleon color. When it’s up against the darker green walls it looks very nice. On the lower parts though, it tends to get washed out by the white tile on the walls and floors. When looking at the door casing from top to bottom it almost seems to change colors. Not much I can do about it.

Here’s a few shots of the nearly finished trim. It was hard to get a good shot of the window because the light coming in prevented to flash from going off when I shot it straight on.







Sunday, June 17, 2007

The Built-Ins Are Built In



Before anything, though, I got the heater hooked up and running, because this is, after all, June in Eureka. The days are pleasant, but the nights can get a bit chilly. This bathroom is on the west side of the house, and without the use of a heater, it takes a while to warm up.



The next issue was the door. I’ve been collecting period Eastlake doors for years, and I actually have more than I need. The problem is, I only have one 30-inch door, and it is majorly funkified. This thing may be beyond repair. The best thing it’s got going for it is the fact that it’s 2 and a half inches too short for the opening. After that, things go down hill quickly. It’s cracked, has chunks missing, and big dings in it. Still, it’s a 30-inch door so I hung it anyway. I like to know that the jamb is square and true before I put the trim on. It looks like I may end up cutting down one of my many 32-inch doors for the opening.







There is a mix of primer and paint in the pictures. I hope to start with the top coats tomorrow. It went pretty smooth putting the built-ins in. At this point the plan is to do hex tile counter tops. I would like to do marble, but I don’t have enough. I have enough for the small built-in, but not the larger one.

The casing and plinth blocks are original to the house. Some of the grand entry ways were reduced in size during the 1920s apartment phase. They cut down the trim to get it to fit to the newly reduced size doorways. I had new casing made for the re-enlarged openings, and this original stuff is perfect for things like this. In fact, this entire doorway, with the jambs, casing, and plinth blocks was the opening from the foyer to the front parlor before I took it out. The corner blocks are reproductions of the originals, so this looks exactly like all of the other doorways in the house.

I am really glad this is over. Next up will be the trim for the stained glass window. I’m doing a marble sill on that, so I need to borrow a friends tile saw to cut it. I’m not sure when that’s going to happen.

Friday, June 15, 2007

Lino Find

I found it first in my house and then Amy found it in her vintage catalog. How cool is that?



Pictured above is the linoleum I found on my front stairs a little over a year ago when I removed the last of the Hi-Low Drop Cloth from the house. At the time I speculated the linoleum was from the 1920s, when the house was officially cut up in to apartments, but there was no proof.

Well, yesterday I got an email from Amy. She’s been reading the blog and when she saw the picture of the linoleum I posted, it looked familiar to her. In a freakish small-world kind of way, she just happened to have a 1929 catalog from the Orchard & Wilhelm Co of Omaha, NE, and wouldn’t you know it, my linoleum is in there! The page is titled "Armstrong's Straight Line and Embossed Inlaids-Accolac", and it comes in several different colors. Below are a few of the shots she emailed me.

The internet is a strange and wonderful thing, isn’t it?





If only you could still get patterned linoleum for $2.90 a square yard. Or really, If only you could still get patterned linoleum. Period!

Thursday, June 14, 2007

Am I That Transparent?

Many of you seemed so sure I would use the gray grout instead of the white. You all seemed so positive I would scrape away the Antique White grout around the tub area and do the whole bathroom in gray grout. You all thought you were so smart, didn’t you?

Well, you were. I did the gray grout, or at least I started it. I got a late start and my grout float is toast, so I only got about 15% of the floor done. Doing the dark grout on the white tile seems to take a lot longer. I don’t remember changing the water in the bucket as often as when I did the white grout on the white subway tile.

Part of the problem is the grout float I have. As I said, it’s toast. When I did the subway tile I couldn’t find my rubber float so I went down to Ace to get another one. All the had were these cheap plastic ones with a sort of soft Styrofoam pad on them. It turns out they work very, very well, but the foam wears off quickly. They are inexpensive, so it’s no big deal to get another one.

The problem when the foam starts to wear down is that you can’t all of the excess grout off. This is compounded by the subtle unevenness in the height of the tiles. It takes forever to work at it with the sponge and it’s a real waste of grout.

So I stopped for the evening and tomorrow I’ll start back in with a new float. I think this is going to take longer than I thought. I may not finish until Saturday.

Wednesday, June 13, 2007

All But Two Slivers



You can see at the left side of the door there are two half tiles that need to be installed. I need to get the door open to do that, which I can’t at the moment. I guess it was a little over 2 years ago when I re-enclosed this small area of the porch that had been opened up in the 1920s. At the time I new I was going to be doing some period style tile in here eventually. What I didn’t know at the time was that the tile would be a half-inch thick.

I had to do the last of the tile while sitting outside the backdoor. Well, after I got all of the tile in, guess what? The door wouldn’t close. It closed most of the way, but for the last few inches the outside corner dragged on the tile. I pulled up on the door as hard as I could and eventually forced it shut. I need to wait until the tile sets and then I can force it back open, and then remove the door and trim just a hair off the bottom. After that, I can then put in those last two half tiles.

I was happy with the spacing, though. I was afraid I would end up with ¾ tiles, or some other odd size at the end. I’m also happy with the fact that I don’t have a ridiculously crooked row at the door. After installing 15 linear feet of tile across the floor, the last row at the door is surprisingly straight. I would say there is less than a quarter inch difference in the width of the last tiles from one side of the door to the other. Frankly, I’m shocked.



I also got very lucky at the transition from the kitchen to the mud room. As you can see, I have all half and whole tiles up against the marble threshold. The tiles are a little crammed in to accomplish this. The grout lines go down to a hairs breadth at some places. I think it’s better than having a bunch of funky sized tiles at a very prominent focal point.

So that’s pretty much it. I hope I can start to grouting tomorrow. I need to deal with the back door first. I’ve decided I’m going to use the Antique White grout. I’m just really very tired, both physically and mentally, from dealing with the tile. I really don’t want to dig out and re-grout the area under the tub.



Above you can see what I call Reject Sill. There are little piles like this all over the place. All things considered, the loss wasn’t too bad. I opened 18 of the 20 boxes I salvaged, and I think all of the rejected tile would make up about 2 boxes. That means I was right at about 100 sq ft of tile installed.



Over all I’m very happy with the floor. It is a bit funky, I’ll admit. The uneven and tightly spaced grout lines I really like. The only thing I wish I could correct is the thickness of the tile. Given that they all aren’t exactly a half inch thick, there is a variation in the height of the tiles. It’s very subtle, but it is there.

I tried to correct for it when I noticed it as I was installing, but it was hard. During installation, I’m basically looking directly down on the tiles, and it was not always easy to spot the problem tiles. It could be an issue when sweeping the floor, but I don’t clean my bathrooms that often anyway, so it shouldn’t be an issue for me.

I’m hoping I can get some major plumbing things installed this weekend because next week I’m starting a very hectic pace in my life. I’m sure the blog is going to suffer tremendously, but I’ll be back.

Tuesday, June 12, 2007

For No Apparent Reason

TOH 2147

As this weeks show opens the camera is following Hosting Unit #23 and the last of the Series 7 Norm-Bots as they hover through the project house.

Hosting Unit #23: “Well, what do you think Norm-Bot.”

Series 7 Norm-Bot: “I must say, this place is really coming together nicely. What are we going to be looking at today?”

Hosting Unit #23: “Today we’ll be talking about the bathroom installation. As you know most of the worlds water supply is so polluted it can no longer be used for anything. It’s mandatory that all water and bodily waste be collected and returned to the processing plant.”

Series 7 Norm-Bot: “That’s right, and ever since the mass executions 12 years ago for failure to comply, it’s become a real issue for any the new homeowner.”

Hosting Unit #23: “Just a few years ago, the thought of having a shower in a bathroom was unheard of. Any water that splashed on the floor could not be saved and was sure to spell brutal retribution for the homeowner.”

Series 7 Norm-Bot: “Sure, but then someone dug in to the Google archives and stumbled upon The Petch House blog. Greg Petch, as he’s come to be known, came up with an innovative way to have a claw foot tub with no shower curtain. There was a drain under the tub that collected any water that spilled over the edge.”

Hosting Unit #23: “It really was a clever solution even though those fools did not recycle the water back then”.

Series 7 Norm-Bot: “How could they know that they would be invaded by an alien race that would poison the worlds water supply in an attempt to wipe out the human race.”

Hosting Unit #23: “Well, they couldn’t, but isn’t funny that it was the planets beaming out in to space endless hours of inane TV broadcasts, which eventually irritated the aliens so much that they came here to try to destroy the planet, and here we are again beaming more crap out in to space.”

Series 7 Norm-Bot: “It is kind of funny, but anyway, what about the shower.”

Hosting Unit #23: “Well, naturally, we will be doing a Traditional Petch Installation, as it’s come to be known”

The Series 7 Norm-Bot and Hosting Unit #23 hover through the nearly completed bathroom as they go over the details of a Traditional Petch Installation. We meet back up with them at the end of the show.

Series 7 Norm-Bot: Boy, the Traditional Petch Installation really works well. It’s hard to believe they used to do it any other way.

Hosting Unit #23: I know, and of course, in later years, Greg Petch became more known for his sexual prowess than he did for his innovative shower installations and the term “Traditional Petch Installation” took on a whole new meaning.

Series 7 Norm-Bot: It sure did. In fact, I think I’ll go home right now and treat my wife to a “Traditional Petch Installation”.

Hosting Unit #23: But wait Norm-Bot, you’re just a Series 7, you’re not human. You have no wife, and frankly, I’ve seen your schematics. Even if you had a wife you would need a serious hardware upgrade in order to give her a “Traditional Petch Installation”.

Series 7 Norm-Bot: {The head module droops slightly.} “Oh, that’s right, I’m not human. I keep forgetting.”

Suddenly it seems something’s not right with the Series 7 Norm-Bot. The camera zooms in on the face plate, and you can see a slight trickle of lubricating fluid leaking from the ocular implants. As the fluid runs down the face plate it seeps in to the now distorted mouth piece and causes short circuits on the delicate internal mechanism of the Series 7. The head begins to smoke and then bursts in to flames.

The camera pans back to Hosting Unit #23 and with the glow of Norm-Bots flames dancing off it’s shiny armored surface, Hosting Unit #23 continues, “Well, that’s our show for today folks. Join us next week when myself and a new Series 8 Norm-Bot will be looking in to the installation of the houses autonomous, self-contained kitty unit. And hopefully the new Series 8 Norm-Bot won’t be plagued with the lubricant leaks like the troubled Series 7s were.

Goodnight everybody!

Monday, June 11, 2007

Tiles In!

The bathroom anyway. I still have the little mud room. The bathroom is a little over 10X6, and the little mud room is just about 4X5. I’ve gone through 12 of the 20 boxes of tile, so I’m in very good shape. The goal is to finish up the mudroom tomorrow, then let everything sit on Wednesday, and then grout on Thursday. The grout has become a bit of an issue, but first, a picture

Ta-da!


As for the gout, the original plan was to do a light gray grout. I used gray mortar to set the tile and I bought an un-sanded grout called “Delorian Gray”. I first grabbed it because I thought it was called “Dorian Gray”. I think that would have been a cooler name for it, but who am I.

Anyway, I was all set for Delorian Gray until I had the problems with the tile under the tub. I wasn’t happy with my grout lines so at the last minute I switched to “Antique White”. It’s very similar to the color of the tile, or, at least the color some of the tile. There are variations among the different tiles. I was worried about this as well, but I think it’s very pleasant, and actually probably better than having all uniformly white tile on the floor.

Anyway again, I now have all of the tile in the bathroom, and if I was getting a report card on my installation the teacher would probably write “Much Improved”, and I would agree. With the exception of one area, I think the rest of the bathroom came out very nice and I think it would be nice to show off my razor thin, yet asymmetrical grout lines.

Unfortunately I’ve hooked my wagon to Antique White. It seems it would be very odd to have Antique White under the tub area and Delorina Gray in the rest of the bathroom. Don’t get me wrong, the antique white is not hideous. It’s not like I have gag reflexes every time I look at it. I just think the light gray would be better.

I’m left with 2 options. One, I could just do the whole bathroom in Antique White and be done with it. The other option is to move the tub out of the way. Get a grout knife and carve away at the antique white grout, and then regrout the entire bathroom in Delorian Gray. At this point, I’m leaning so far towards option one I’m practically laying on the floor.

Option 2 would push the whole project back a few days. You might be thinking that it’s already been 6 months working on this stupid, God forsaken bathroom, what could a few days possibly matter. Well, IT’S BEEN SIX FREAKIN MONTHS WORKING ON THIS STUPID, GOD FORSAKEN BATHROOM!!!! I’M READY TO BE DONE WITH IT!!!!

I have until Thursday to decide.


A dreamer is one who can only find his way by moonlight, and his punishment is that he sees the dawn before the rest of the world.
Oscar Wilde

Saturday, June 09, 2007

Funky See, Funky Do

These tiles started out life as “Seconds” and it’s easy to see now why they were designated as such. They are Funky with a capital “F”.



At this point I really must laugh at the fact that over a 100 years ago they were deemed second quality. They were either going to be dumped or sold at a discount someplace. Then 100 years later I chisel them off the floor and reinstall them. Many of the first quality tiles are probably still not around, and here these poor little tiles are starting a new life.

Some things I’ve learned about these tiles are a) they are not all 2-inches wide, and b) they are not all a half inch thick. These are the reasons they were deemed “Seconds”, I’m sure. Ninety nine percent of them are 2-inches wide, but many of them are not a half inch thick. I’ve been able to spot the few narrow ones (we’re talking an eighth of an inch or less off) and I use them when the grout lines start to get tight. It actually works out well



I was meticulous with the first few rows past the tub area. I laid out all of the tiles ahead of time and made sure they were good. I had to put in a half row on either side of the divider, and that took a lot of time. I used a sliver of half inch cement board to raise the quarter round a little. I’m not thrilled with contrast between the super white, glazed quarter round and the, shall we say, less than white unglazed tiles. I almost ran down to the home center to see if I could find a substitute, but decided against it. I really won’t find a match, so why bother.



Once I got past the first few rows the pace picked up, but it is still slow, meticulous work. Laying them free-hand, without the spacers is definitely the way to go. I’ve had far fewer problems than I had in the tub area. Below is a close up for John. I think it looks good. I really, really like them.

Thursday, June 07, 2007

Interesting Comments & Tub’s In

I got a comment from John, the owner of DEA Bath today. It was short and to the point, but it speaks volumes.

Hi Greg;
Glad you got the last order right. Yes, we did have an idiot working the front, but he's gone. Things should be better now.
John
Bathroom Machineries

After I got the comment I thought back to my first encounter with the “idiot” last December. At the time, John called my house to try and figure out what was going on after I shot off an angry email. I never returned his call, but in hindsight I should have.

I’m not one to be a squeaky wheel, especially now that I have the blog, but had I known then that I would be dealing with them as much as I did over the past 6 months it would have been worth it to return the call. So, it seems John cleaned house, and I’m sure it’s for the better, and I learned a lesson. If it’s someone you plan on doing a lot of business with, let your bad experiences be known early on.

I also got a very interesting email from a member of the Petch family. This is an actual, real live Petch that can be traced right here to this house. It was from the Great Grand Daughter of Thomas and Phyllis Petch. Her father is the son of the youngest of the Petch boys.

Apparently, the grand son of Thomas Petch, the woman’s father who contacted me, is getting on in years, and the family decided to make a trip to No. California to see where it all started for the Petch Family in America. I guess after some brief Googling they found my blog and want to stop by for a visit this summer when they’re in the area. I said yes, naturally.

The best part is, they have pictures, or at least a picture. The woman mentioned she has a family picture dated 1888. That does pre-date the Petch House, but that’s fine by me. To date, I’ve not found one scrap of a picture of anything relating to the house or the family and I’ve poured over several photo archives. So, that’s pretty exciting.



And finally, the tub is in and hooked up to the drain. It fits nicely, but it is off-set one inch to the left for some reason. I planned on 4-inches on all sides. No matter, it’s in and it looks nice. Now I can start to tile the rest of the floor.

Wednesday, June 06, 2007

Still Life With Tile

Minor modifications had to take place before I could grout.



I did a final check on the slope after I got the tile in and it raised just slightly right at the drain. I must have had the drain a little higher than I thought. I had to chisel out some tile AND some cement to lower the area right around the drain just a little. My ¾ inch chisel will never be the same. It didn’t take too long, really. I got everything back in and the slope is good now.

I also had a minor flood when putting on the shut-off valves today. When tightening down a slightly leaking compression fitting, it is NOT “left lousy – right tighty” when turning the back nut. I new this and repeated to myself to turn the back nut to the left, but instinct took over. It had just a very, very minor drip on the valve for the toilet. It just needed less than a quarter turn to tighten it down. I turned the wrong way and the damn thing hit me in the face as it flew off the pipe. Water went every where. This precluded me from grouting right away.

I did get all of the shut-off valves on and the switches and switch plates. Everything seems to fit, but one of the push button switches is bad and will need to be replaced. They sure do look nice, but these switches are serious pieces of shit. I’ve had to return 4 or 5 of the 20 or 30 I’ve installed in the house. Also, the mounting screws are just the cheapest screws they could possibly buy. I don’t even attempt to use them anymore. The first thing I do when I get these switches is remove and throw away the mounting screws and replace them with new 6-32, flat head machine screws.





Sunday, June 03, 2007

My Final Petch House Project

Yep, this is it. The bathroom will be the last project I ever work on on The Petch House. Oh, it’s not that I don’t want to work on any other projects. It’s just that the bathroom project will never end. I’ve come to the conclusion that I will be working on the bathroom until the end of time.

After some serious butt dragging I finally started installing The Oberon Saloon tile. Honestly, I never thought I would write that. One of the reasons for the butt dragging is because of one of my personality traits. I’ve been here before many times. This weekend I was at that point of no return on the tile installation. Once I started there was the chance it wouldn’t turn out well, so in my warped mind, if I never start, then I’ll never screw up. There’s that, and my whole attitude is in the crapper this week.

Well, I sort of pushed through that mental barrier and started this morning. Actually, it was more like this afternoon when I started. Anyway, it was very slow going at first. I’m doing the shower area first, and I will finish it with grout before I move on to the rest of the bathroom. Once the shower area is done I can move the tub in to that area and get it off the floor of the rest of the bathroom.

I started by laying one row of tile along the back wall to see about spacing. I was very close to having no partial tiles on the first row. I then laid two rows in mortar. After I laid the tiles in mortar though, it wasn’t as close as in my test run. I had to quickly try and nudge all of the tiles to make up a half inch near the wall. It didn’t work as well as I hoped, and some of the gaps between the tiles are wider than others.

I almost pulled it all up and started over but I decided not to. You won’t see any of this because it will be behind the tub. As I moved out away from the wall I’m able to slowly fix the problems with the first two rows.

I found one-sixteenth inch spacers at a tile store, so I started using them for this installation. I started and then I stopped. They are really time consuming to put in. There are 6-sides to each tile, and putting in all of the spacers really slows down the process. After 3 and a half rows I just started doing it by eye. I’m able to move faster and the results are the same.

I think that’s probably how they were put in originally. The original installation had an organic property to it. The tiles weren’t all evenly and perfectly spaced. I recall that when I was pulling up the tile, I thought the installation looked a bit amateurish in places. Now I see why. Even with the spacers, it’s hard to keep everything lined up perfectly. It’s hard to explain why. Maybe there is a little too much mortar in places and it prevents you from getting the tile in close, or it could be something else. It’s very odd.

Because I’m creating a giant honeycomb, subtle variations in the grout lines can get magnified over several rows. Just as quickly the variations disappear, or sort of move over and end up someplace else.

Definitely, the first two rows being a little wacky has caused problems in later rows. The good news is, I’ll get a second chance to start over. There will be a divider of quarter-round between the tub and the rest of the bathroom. I will pay closer attention to that first row once I’m on the bathroom side of the divide. The tub area is good practice.

This is all I have to show for my retched self.

Friday, June 01, 2007

A Petch House Miracle

The package arrived from DEA Bath today - 4 days after I ordered it - and they got the order right! It’s almost unbelievable. To make this even more special is the fact that when I called them their web site was down and I had to have them talk me through picking out one of the items.

I needed an inch and a quarter drain assembly for the antique sink. There are several drains to chose from in all different sizes and configurations. If the site had been up and running I would have probably been asked to select one based on the crude pictures and vague descriptions on the site. Because the site was down he had to ask questions and talk me through the selection process. In other words, actual customer service. Quick, somebody ship a load of parkas to hell.

So I think the solution here is obvious when dealing with these guys. When you call, if you have questions about which part is the correct one, tell them you can’t bring up their site, and force them to help you make a selection through a process of Q&A. It’s fiendishly clever, I know.

One of the items I ordered was the spray on repair for the tub. I mentioned the other day how there was some discoloration under the faucet. At first I speculated that it might be rust, but I also guessed that it could just be the enamel has worn away. That appears to be the case, because it looks like I’m showing cast iron. If that’s the case, all of the cleanser and grunt work in the world won’t make it go away.

The stuff I bought from DEA Bath is called Surface Repair by Multi-Tech Products. The color is “Plumbing White” and it is specifically for enamel repair on bathtubs, sinks, countertops, stoves, etc. I’m not sure that I would use this for large repair projects, but for what I have, I think it’s the best way to go.

I was going to apply it today, but if the truth be told, I’m in a really shitty mood {Has anyone else noticed the increased rise in the level of profanity on this site lately?}. My entire life seems to be in flux at the moment. There is really a lot going on, some of it good and some of it bad. The house has taken a back-seat, and for anyone who has read this blog for any length of time, you know that is most unusual.

Change is good though. It forces me to look at things differently. The more change that occurs, the more I look at myself, and the more I reevaluate my place in the world. This is going to be a very interesting summer. I don’t know right now whether that is good or bad.

Wednesday, May 30, 2007

Marathon Man

Quick, what’s 123X36X6? You give up? That equals 26,568 2-inch sides of pure, living hell.

One hundred and twenty three square feet of tile.
Thirty six tiles to a square foot.
Six sides on a tile.

Is that right? Does that really come to 26,568, or did I do that math wrong? That number seems too big, but regardless, the fucking tile is cleaned. I cleaned all of the Fucking, God Damned Oberon Saloon tile!


It’s done!



I finished!



Now I need to install it. My life is a chaotic mess at the moment, so it looks like Saturday, at the earliest.

Monday, May 28, 2007

Tub Is Ready

I painted the outside of the tub today and attached the newly {Shwing!} nickel plated feet.



I glued the tub to the ceiling to get it out of the way and make it easier to work on. I used more of the 3M 5200 Marine Adhesive Caulk to stick it up there. Boy, this 3M 5200 is incredibly strong stuff. Even through the cardboard it’s holding the tub up there. I hope I can get the tub down when the time comes.



This tub came out of the downstairs rental bathroom that was in the 2 story addition I removed. The tub is dated 1922 but the toilet was dated 1926, so I’m not sure exactly when the addition was built. Either they had an old tub, or the toilet was replaced very early on.

The visible side in the picture will be against the wall once it’s installed. The other side, that you can’t see in the picture, had never been painted, which is cool. I should be able to get a good long lasting paint job on the bare cast iron. I sanded the whole thing down and then washed it. After that I applied a few coats of flat black Rustoleum.



I painted the upstairs tub the same way. I like the contrast between the white enamel on the inside and the flat black on the outside. Also, the nickel feet really stand out against the black. I didn’t nickel plate the feet on the upstairs tub because I’m really a cheap bastard. You wouldn’t know it the way I’m spending money on the downstairs bathroom, but really I am. On the upstairs tub I just painted them with a sliver paint. The main reason I plated the feet for the downstairs tub was because of the design of the shower, otherwise they would have gotten the silver paint as well. These feet will see a lot more water, so I’m hoping the plating will protect them some.



Here it is after I got it off the ceiling and with the feet attached. The inside of the tub is in mostly very good condition, with the exception of the area just under the faucet. It looks like some lazy ass landlord didn’t fix a leaky faucet for like 40 years or something. (Me yelling at the window while shaking my fist, “Damn you lazy bastards! Damn you to hell!”). It’s not rust, so much as the enamel is worn down. There is noticeable discoloration. Once I get it hooked up to water I’m going to see how well it cleans up with some Bar Keepers Friend and a little grunt work.



If that doesn’t work I will sand that area a bit and paint it with some white enamel spray paint. Someone told me once that this is a good way to fix minor problems like this. There is a special paint to use, but I don’t know what it is. I think Sacto Diane mentioned it on one of the forums once. I’ll need to search her out. I’ve been told that even a good resurfacing will only last about 5 years, so I’m trying to stave off that as long as possible.

And fiiiinally (Say that with as much exasperation as is possible) I finished working under the house. My goal is to not crawl under the house for 12 months straight. That will be a record. After I finished all of the drains for the tub, the last thing to do was finish the exhaust for the dryer. Right where that dryer vent is there was a “after market” hatch added to the house. It wasn’t done well and has been broken since the day I bought the place. I think it was added by a plumber or electrician in the last 20 years or so.



There are 2 other real access hatches to get under the house, but because of the rats nest of pipes and wires under the house from the apartment days, it was impossible to get from Point A to Point B while under the house. Anyway, I had a few pieces of the original bead board skirting that I found under the addition I removed, so I got rid of the crappy hatch and just boarded it over with the beadboard.

You’ll notice the ham loaf just had to be in the picture. I swear, I think he understands the concept of photography.

Saturday, May 26, 2007

Purchasing Punch List

I'm thinking Bathroom End Game here. I got the last of the Oberon Saloon tile out of the bleach today. I have exactly 1.8 boxes left to de-grout and then I can start the installation. I ended up with 123 sq ft of tile. I think I need about 90 sq ft, so I won’t need to worry about the stuff that either won’t come clean or is too badly damaged. I’m guessing that is close to 10 sq ft. I should be in great shape.

There are still a few more small purchases that need be made, though. They're small, but they add up.


2 Push Button Light Switches. I bought all of the other switches in the house from House of Antique Hardware when I re-wired 4 years ago. At that time I only paid $12.75 a piece for them. (I say "only" like $12.75 is a good price for a light switch) They are now $15.79 each at House of Antique Hardware. The interesting thing is, these are made by Classic Accents. When I bought them 4 years ago, House of Antique Hardware had a better price than Classic Accents. Today I tried to find the Classic Accents web site but couldn’t. Still, I’ll shop around. A lot of places carry these now. For now, I’ll say $30.


1 GFCI Plate Cover. This is also from House of Antique Hardware. It matches everything else in the house. I have a double switch plate and a standard outlet plate in the same design already, so I just need the one GFCI plate. $10.79. I don’t recall if this is what I paid 4 years ago, but I remember paying around $6 for all of the single switch plate covers in the same design. They are now $9.79.


3 Angle Stop Valves. These are the shut off valves for the water supply lines for the toilet and sink. All of the plumbing is exposed, so I want something nice. I’ll get these from Mac The Antique Plumber. The picture is brass, but I’ll get them in chrome. Nickel is not an option on these. They are $31.20 each, so that’s $93.60. DEA Bath carries them as well, but that are $39.00 each for the exact same thing.

Thinset, grout, and caulk for the tile floor. The caulk is the 3M stuff, so that’s $33.00. The grout and thinset are another $35, so together that comes to $68.00.


Soap Dish for the Tub. The ones in the picture are $36.00, but I think I can do better. I’ll say $25.00


Oak Toilet Seat. The one in the picture is $27. That seems about right.


Sink Clamps. The new vanity is missing the clamps to hold the under-mount bowl on. DEA Bath has them for $19.50

Drain Assemble. This is for the antique sink as well. I forgot to order it months back when my DEA Bath odyssey began. This is around $40.00, and this is another DEA Bath part. There are several to chose from on their site so this means I’m going to need to call and ask questions. I’m absolutely dreading it. The guys that run the front desk are just so incompetent. It’s just unbelievable.

I think I’m going to call on them Tuesday because by the time I get the order and return it several times it could be more than a month for me to get the correct parts.

I think that’s pretty much everything. There is still the window and door to trim out, and I need to hang the door, and put on the door hardware, but I have all of that. The light fixtures need to be hung, but they are all ready to go. Unless I forgot something, I have all of the other plumbing parts for the sink, toilet, and tub. I have all of the shelves, hooks, TP holder, and things like that. The two cabinets I built are complete and painted.

The total for the things above comes to $312.89. I’ll round up to $350.00 to cover any shipping or taxes, and I’m sure there will be more sandpaper and drill bits to buy. At least all of the spending of money on the bathroom is coming to an end. This has been one of the more expensive projects I’ve done. I think maybe only the kitchen was more. Bathrooms and kitchens….man, do they take a toll on the old wallet.

Wednesday, May 23, 2007

Anatomy of a Petch Shower

For the start of this story, and if you want to comment on this, please read the May 21st blog entry.

Let me just say that now that I’ve done this, there are definitely things I would have done differently, if I had the chance to do it over. I guess that is one of the consequences of being iconoclastic, to put it politely. Stubborn and obstinate might be a less polite way to put it. Be that as it may, the floor is done and I think it will work.



The existing framing of the floor presented the first challenges. You can see I’ve numbered the joists. The faucet and shower head will be on the right in this picture. Joist number one presented the first problem. The wall just to the left of it is the “wet wall” I built. This meant I couldn’t really remove the sub floor there because this wall is no longer sitting directly over a joist. Also, because of all of the new plumbing, I couldn’t get a new joist under it. This would have been so much easier had I come up with the idea prior to building the bathroom, but there’s nothing I can do about that now, so let’s move on.

Joist number 2 and 3 are standard 2X10 joists. Joist number 3 ended up being the low point. Joists number 4 & 5 were at one time the exterior wall of the house. They sit on top of an 8X6 sill. Then there are the 3, 2X6 joists labeled as 6. These sit on a 4X6 that makes up the new exterior wall. This is a single story section of the house and they pushed the back wall out about a foot back in the 20s.



I shaved the joists to make the slope for the floor. Joist 3 became the low point and joist 4 was just trimmed down and abandoned. I added more of the 2X6 joists, and there is a new 4X6 support for joists 2 and 3. Joists 5 & 6, of course, sit on the 6X8, so they needed no extra support. Out of the picture there is another 4X6 support for joist 1 and the next joist to the left. The plumbing made it difficult to extend a single 4X6 to pick up all of the joists.

This small area of the house, right along that new wet wall, has a claw foot tub, 40 gallon water heater, washer, dryer, marble vanity, toilet, the cement floor under the tub, and all of the tile. The extra support might be over-kill, but as I said the other day, the floor was open and I had the lumber and piers laying around, so why not.



I then put the sub floor back in and I had the pre-slope, except for the one, 6-inch section at the far left. As it turns out it has a subtle slant to it in the right direction, but it would have been much better to include it in the shower area. I don’t think it will cause problems though, because when the shower spry hits to that area it will be completely contained in the tub. I mean, the last I checked water still runs down hill, so if a little water back there it should be ok.



I used an Oatey pan liner and drain for this. I thought the pan liner was going to be some high-tech polymer sheeting, but it’s just 40 mil PVC. Big whoop. I used both T-Rex polyurethane caulk and the 3M 5200 Marine Adhesive Caulk to install the liner. For the purpose of this discussion, I won’t really distinguish between the 2. I extended the pan liner all the way to the left and used the 3M 5200 Marine Adhesive to secure the liner and the piece of cement board. This would never be sufficient for a floor people would walk on, but once the tub is in place it will be impossible to walk on it. The tub will be centered in this area with 4 inches on all 4 sides between it and the tile. The liner extends a little ways under the cove of the tile and all seams where tile and liner meet are sealed with 3M 5200, as well. Oatly recommend the liner extend 2-inches up the wall, but that didn’t happen. All of the cement board in this area does sit 4-inches of the ground on top of redwood.



The faucet and tub drain presented the other problem. There is nothing you can do about the drain, but had I thought this through more I might have had the faucet supplies come out of the wall. To late for that. I cut the pan liner as best I could when I laid it in and then used a secondary piece with more of the 5200 to seal everything up. This will all get additional 5200 once the tile is set.



And finally today I laid the cement floor and created the final slop for the drain. The cement mix for this type of installation is very dry and sandy, and I found it very difficult to work with. I was supposed to use a screed (a long, flat piece of wood) to smooth it out and create the slope, but I found that very difficult as well. I think this is one of those things where this is what the pros use because they’ve been doing it for years and apprenticed under someone for years. I’m not a pro and I’m not going to master the art in one shot. I got out my plaster trowel and a straight edge, and along with level, I was able to get a smooth, even slope towards the drain. My slope is a little deeper on the right than on the left, but last time I checked water still runs down hill. I will be working with a much lower volume of water than a standard shower, so I hope it will be ok.

I’m sure if a professional tile setter saw what I was doing he would say I was nuts and this will never work. I don’t have a problem with that at all. They generally don’t get paid to try new things and I don’t really blame them. If something goes wrong then they will be called back to fix it. Why do one job that you’ve never tried before when there are 10 jobs where you can pound out the same shower stall you’ve done a hundred times before. So, we’ll see what happens. I’ve very excited about it. I think it’s going to work.

Tuesday, May 22, 2007

Little Help

So I started thinking to myself today, I’m not going to be able to test this shower by myself. I can’t be standing in the tub taking a shower, while at the same time watching the drain under shower to make sure the drain works properly. That’s right, I’m going to need some help.

So all day today I asked women if they wouldn’t mind coming to my house in a few weeks so I can watch them take a shower in my new bathroom. You wouldn’t believe some of the reactions I got! I was slapped, kicked, punched, and yelled at. One woman even tasered me! What the hell’s the matter with people that they are so offended when someone asks for help? I don’t get it.

Is it just me, or has our society taken a wrong turn when it’s no longer appropriate for a strange man to ask a woman to come to his house so he can watch her take a shower? What has become of our society?

Maybe I’m phrasing the question wrong. Maybe I should be asking if they want to come over and watch me take a shower. I’ll try that tomorrow and see if I get a better response. I just hope there’s no more tasers. That first one left a mark.

Monday, May 21, 2007

The Shower Drain

The idea here is to have a claw foot tub with a shower but not have that all encompassing shower ring that makes you feel as if you’re showering in a condom. At the same time, I don’t want the shower stall type installation with the 6-inch curb and the thick build up of a sloped cement floor. A large portion of the water will be contained in the tub, but some of it will splash off the body and go over the side. It is this water that presents the challenge. Keep in mind when reading this that it will be virtually impossible to walk on this floor, because the tub will take up all of the space. This is a tile floor made up of half-inch thick tiles under a claw foot tub.

First some ground rules for this series of posts. To all of the nattering nabobs of negativity who will be chomping at the bit to fire off a comment telling me I’m doing it wrong as you’re reading this, please save your keystrokes. With all due respect, just because you read something some place that tells of a different way to do it, does not necessarily make you an expert, so please keep your doomsday opinions to yourself because I don’t want to hear it. If anybody wants to leave a comment regarding any of the topics in the following list, you will be wasting your time. It’s not my fault that you lack the ability of creative thought and are afraid to try something that has not been explained to you by a professional.

Yes, I familiar with the John Bridge tile forum
No, I didn’t ask them what they think about the installation
Yes, I know about Terry Love’s tile forum
No, I didn’t ask them what they think about the installation
Yes, I know this hasn’t been certified by some ANSI geek in a lab coat
No, I don’t think I’m going to destroy my house
Yes, I know about “wet floor” installations
Yes, I know that a traditional shower stall could have as much as 3-inches of cement
No, I’m not using a Kerdi Drain system
Yes, I know how to properly mix cement and sand for this type of mud bed
No, it is not too thin of a mud bed.
Yes, my old redwood plank sub floor is thick enough
No, I don’t think plywood would have made a better sub floor


Now that we understand each other, let’s move on.

The first plan was to use 3M’s 5200 Marine Adhesive Caulk to caulk each tile instead of grout. As a note of interest, when I first mentioned this idea it was poo-pooed by a few readers. Some even sent me emails telling me this was a bad idea and would never work. The funny thing is, none of them said they had used or even heard of the product. I mean, if someone emails me saying they’ve used the product for the last 10 years and said this may not be a good application for it, I would thank them. To just fire off an email when you have no idea what your talking about, I find a little insulting. Another interesting point is that while I was researching the product I found a professional tile installer who regularly uses the 5200 caulk on marble tiles in shower stalls because he doesn’t want grout lines. That’s right, I said no grout.

I bought a tube of 3M’s 5200 Marine Adhesive Caulk. First off, it ain’t cheap at all. It is roughly 10 times more expensive the your average 30 year door and window caulk. I did tests with silicone caulk, polyurethane caulk, and the 3M caulk. I took several tiles and glued them together to see how each caulk held up.

The tiles are the Oberon Saloon tiles and they are a half inch thick, unglazed porcelain tile. Silicone caulk worked about as well as toothpaste on the almost polished edge of the tile. The polyurethane caulk was better, but failed very quickly. The 3M caulk would flex more than a quarter of an inch before peeling away from the tile. Given that I am doing 1/16 inch grout lines, that means the tiles would need to separate 4 times their installed tolerance before failure. I don’t think that’s possible, unless I were to be hit with a 8.0 earthquake.

The real problems with the caulk idea are the installation and the color. The installation would be beyond tedious. These are 2-inch hex tiles and it would take forever to install each tile and clean up the caulk that oozes out as I go. I don’t think it would be a good idea to let this stuff dry on the surface of the tile. After all I’ve been through with salvaging and cleaning the tiles, I’m not sure I could go through that. The other issue is the white color of the caulk. I’m doing gray grout, and it would look odd to have two different colors of grout in the room. So I ditched the idea.

Then Aaron over at HiP told me about an article in the March issue of Fine Home Building. They were doing something similar to me. They wanted a shower that had no curb. Theirs was not a claw-foot tub, but just a regular shower. What they did was frame the floor of the shower area 4 inches lower than the rest of the room. They could then build back up to the rest of the floor in the room and still have the slope towards the drain.

This is great idea, but it is better suited for new construction. For me it would have taken major reframing of the bathroom floor, and I wasn’t really prepared to do that. I thought and I thought and I thought and I thought and I thought and I thought and I thought….and then I thought some more. There must be away to achieve what I want. Then a few weeks ago while I was plastering the bathroom, an idea came to me. It was odd. I was in the yard hosing out the mixing tub and thought, why not lower the existing floor in the tub area just a few inches. I thought, what is the point of going down 4 inches and then building back up with cement.

The tub area is about 5 feet long. With the drain in the center, if I need a quarter inch per foot slope, then that is only about a half inch of slope I need. So I started to wonder what is the minimum thickness of the floor I would need. The drain for a shower stall has a main drain and then a supplemental drain. There is a membrane under the floor that catches water that inevitably gets under the tile. This water makes it’s way along the membrane and drains in to the supplemental drain.

You need to have a sturdy floor on top of the membrane to set the tile. You can't have any type floor that needs to be fastened with nails or screws, because they would poke a hole in the membrane. This is the reason for all of the cement. You build up the floor in layers. You start with a flat floor and build up a “pre slope”. This is for the membrane to sit on and it slopes towards the supplemental drain. Then you pour the main cement floor on top of this. This creates the main slope of a quarter inch pre foot slope so water drains properly in the shower.

So what is the minimum thickness of this floor. Well, at it’s lowest point at the drain it is 1.25 inches (or 1.5 inches, depending on who you ask). It gets progressively thicker as it moves away from the drain. I went to one of the tile forums and asked a serious of questions. I never really said what I was doing, because I would get a hail storm of people telling me I was crazy. I’ll be honest with you, I have no idea if this will work, but you know the old saying, no gut’s no glory. If this is a failure I'm perfectly secure in the fact that I tried and failed, and I will go to a traditional shower ring. But how will I know if it will work or not unless I try.

Anyway, I had a excruciating series of discussions with tile guys and it was eventually decided that if the floor was flat then an inch and a quarter cement surface was sufficient to set tile. That’s all I needed. I just need to come up with an inch and a quarter at the edges, and an inch and three quarters at the drain. I need the quarter inch per foot slope at the drain, that’s the reason for the extra half inch there.

The rest of the room has half inch cement board on it, so you can lop a half inch off all of those measurements. So now I only need to come up with three quarters of an inch at the edge and an inch and a quarter at the drain. If I can do that, I can cover the whole area with an inch and a quarter of cement; create the slope; have the membrane; have the supplemental drain. Wham-bam-thank you mam! There is also the issue of conatainment. Remember, I don't want the curb, but more on that later.

So starting on Saturday, I pulled up the sub floor and started shaving joists. I basically created the entire slope of the shower area by trimming the tops of three or four joists. I started with the most inelegant of tools – the reciprocating saw – and finished them off with a hand plane. It went pretty well. I had to add in some extra framing, but it wasn’t too bad. You need to consider that I’m starting with full dimensional 2X10 joists so even if I take three quarters of an inch off the top, I still have more wood than a modern 2X10. Still, the floor is open, and I had the lumber and piers from the 2 story addition I took down, so what the hell. One things for sure, this is now the firmest floor in the entire house.

It’s still a work in progress and I’ve been taking lots of pictures. Tomorrow I will put in the membrane and pour the final cement floor. It should be very interesting and I still can’t say how this will work. There are still a few question marks and I’m sort of making it up as I go along. As always, I expect the worst and hope for the best.

Sunday, May 20, 2007

And People Say I’m Dense

Work continues on the bathroom floor. I was hoping to have a progress report and show some pictures, but surprise, surprise, things are taking longer that I thought.

In the mean time, here is a comparison of two joists. One is an 1895, old-growth redwood joists from the bathroom. The other is a scrap end of a redwood 2X12 I got from a friend who works at a mill. The 2X12 was milled about a month ago. Can you tell the difference?

Count The Growth Rings

Friday, May 18, 2007

Triple Digits!

I cleaned another box of The Oberon Saloon tile today, so that brings the grand total of ready to install tile to 105 sq ft! I only have     t-h-r-e-e     m-o-r-e     b-o-x-e-s     left to do, one of which is still soaking in bleach. Oh, will it never end? I thought I had gotten it all out of the bleach a few days ago, but I decided to send some back for another rinse. Wash, rinse, repeat.

I don’t think I will get to any tile this weekend, so realistically I’m looking at Thursday or Friday of next week to finish up. (I plan on getting shit-faced to celebrate) That does mean that I may actually start to install some floor tile next weekend. It's all very exciting, even if a bit tiresome at the same time.

This weekend I’m going to finish the drains for the tub. I think I’ve come up with a pretty good solution for the problem of having a claw-foot tub shower with no shower curtain ring.

Stay tuned.

Thursday, May 17, 2007

Second Marble Vanity Is Here

I mentioned last week or so how I bought a second antique marble vanity on Ebay. It arrived today. I was never thrilled with the first one I bought, but after searching high and low it was pretty much the only thing I could find that would work in the bathroom. Wouldn’t you know it, I would find an even better one after I bought the first one. An even better one that was also cheaper.

The main problem with the first one was the color of the marble. It was kind of a smoky gray color. It’s not that I didn’t like it, it’s just that I have a lot of other marble in the bathroom and adjoining kitchen, and all of that is white marble. Plus, the marble skirting that will go around the sink is also white. I attempted to stain the skirting to match the top, but I didn’t go far enough. The plan was to stain it some more once everything was assembled. I’m glad I waited now. The other problem with the original top was that the milling did not go around all three sides. It was beveled on the front but not the left and right side.



This one was only $114 with shipping, so it’s not huge investment. The picture above is what it looked like seconds after unpacking. You can see it has some nasty discoloration on the upper left. Over all it was very dingy and had a lot of mold on it.

I took it outside and cleaned it with soft scrub cleanser and 180 grit sand paper. I had to get very aggressive with it. I then sanded it with 220, 320, and 400 grit. I may try and polish it little, but I don’t have anything at the moment to polish it with.



The results are dramatic. There is still some minor discoloration in that one corner, but that seems to show up more under the flash of the camera than in real life. The best part is, it now matches the apron. As you can see, this one is beveled on 3 sides. This is how it should look.



Here is the original one. It’s just not as nice in my opinion. You can also see that I was not able to get all of the staining out of this one. To be fair, though, I was not as aggressive in cleaning this one. That might look better with more effort.

Now, does anybody want to buy a slightly used, smoky gray, marble vanity. I can let it go for about $100, not including shipping.