I guess that should be, F*ck it! I Did It Again.
I tried to convince myself that the tile job around the window was ok. I don’t think I ever posted a picture of it, and for good reason. I knew it looked bad, but I didn’t want to do it over. Several times last night, and even a few times this morning before work, I went back to the bathroom to look at it. The sides were ok, but the top was hosed up bad.
The problem, or at least one of the problems, was the top part of the window jamb. It sags a bit, from age I guess, and I didn’t really notice when I attached the cement board to it. I also didn’t do a very good job building a temporary wooden ledge to support the quarter round while the mortar set. Instead of building the ledge and making sure it was level and straight prior to putting on the quarter round, I tried to level the quarter round with shims after they were in place. It just didn’t work.

In the picture above, you can see how thick I had to make the gaps just above the quarter round to try bring the next row level. Even with that, all of those tiles just above the window sag a bit. It’s only about 3/8th of an inch, but I noticed it a lot. Especially considering how level all of the other tile came out. In the picture, I’ve already removed one tile, but look at the wooden lath above the tile and you can notice the sag. Also, look at the top of the window sash where it meets the quarter round. You can see how it all sort of swoops down from left to right. It's really bad.
The other thing that bothered me was the sizes of the quarter round. Notice the 3 horizontal pieces in the middle. There are 2, 6-inch pieces, and 1, 4-inch piece. Stupid, stupid, stupid. I really wasn’t thinking when I did that. When I was putting that all together yesterday I knew it was coming out crappy, and just wasn’t paying attention. I was kind of in panic-mode. That should be 3 pieces that are all about 5 & 3/8th inches.
I got home today and couldn’t stop looking at it. I started to put on the wood screeds for the plaster on the walls, but after about 15 minutes I started ripping tile off. The mortar was less than 24 hours old, and while the tiles did not come off without a fight, most of them came off without breaking.

I also decided to fix a third issue with the window. If you’ll notice in the top picture again, I had to cut the tiles down for the first row above the quarter round. Also, I had to cut the tiles on the left more than the ones on the right. I had to graduate the tiles from one side to the other. It didn’t work that well, and that’s another reason from the screwy gaps in the first row. I decided to fix this at the same time.


I shortened and evened up the vertical pieces with the compound miters. Now, I can use full pieces across the top and have them level all the way across.
I used a piece of ¾-inch plywood for the temporary ledge this time. I first drilled holes in it that were much larger than the screws I would use to secure it to the top jamb. Because the holes in the plywood were so much larger than the 3.5-inch screws I used, I could easily adjust the height of the plywood a fraction of an inch in either direction.
Also, I have more quarter round that is going to go on the floor to separate the tub area from the rest of the bathroom. I can use the 4-inch piece for that, which enabled me to use a fresh 6-inch piece so I could have equal length pieces in the middle of the horizontal run across the top of the window.

I tried to take my time and not rush this time. It’s still not perfect, and if I had more tile to re-cut those compound miters, I might try those again. It’s much, much better than the first time, though…..at this point, anyway. It’s level, I know that. I’ll let that set up over night and tomorrow I replace the missing field tiles. If you don’t hear from me tomorrow, that probably means it came out bad again, and I took a sledge hammer to the whole damn room.