The Marble Is On Its Way!
They came by today to make a template. I supplied them with an accurate diagram, but the woman in charge strongly encouraged me to get the template done. I started to protest, but then capitulated because I just got the feeling that the more I insisted against it, the more likely something would go wrong and it would be my fault because I gave them the diagram.
So they came by a made a template today. They showed up on my lunch hour and were in and out in about 20 minutes. They showed up about 10 minutes late and the woman actually apologized for being late. And it was a sincere apology! This sort of thing is almost unheard of coming from a contractor or tradesman.
I called 3 different people for estimates. One place said they only do granite, not marble. Whatever – click! The next place got the estimate wrong. I sent them the same diagram with the same explicit instructions on the edge and they still added in more than $300 for a laminate edge I didn’t want. Even after deducting that, they were still 20% more than the people I ended up going with.
The people who are cutting this marble are the same who cut the slab for the kitchen island. I’m doing the same deal, where they cut the basic shape and then I finish the edge. For the island, they had a partial slab in the yard and I picked it up, so that was dirt cheap. This time, they will need to order a new slab and I will have them deliver the final piece. I will also get the remaining part of the slab, which is larger than the piece for the cabinet. More on that later.
While the young man made the template I took the woman in to the kitchen and bathroom to show her the other marble work I had done. It was fortuitous because she said she would try and find a piece of marble that closely matched what I already had. They buy from someplace down in San Leandro. She told me the cost was about half as much as buying locally.
So they should have the slab by Monday and cut it sometime next week. If all goes well it will be in the house by next weekend and I can start to work on the edge. In the meantime, I’ll work on the shelves and start to make the final door. The only thing besides that, is the trim on the middle section.
I could be done in a month!
1 comment:
I think them making a template is a good thing all the way around; for both you and them. It sounds like they are a great company (apologized for being late - wow) and it's really great of them to try to match your existing marble. Plus she saw your gorgegous cabinet and probably recognized the sweat equity involved.
Post a Comment